IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE LABOR, MATERIALS, EQUIPMENT AND SUPERVISION NECESSARY TO: REMOVE THE GLAZING AND INSTALL AN AUTOMATIC (SENSOR CONTROLLED) 10' WIDE DOOR. THE FINAL PRODUCT SHALL MATCH THE DESIGN OF THE ADJACENT (MIRRORED) DOOR THAT WAS INSTALL IN YEAR'S PAST. THE DOOR OPENING SHALL BE ON THE WEST SIDE (AWAY FROM THE ROAD STRUCTURAL COLUMN ON THE EXTERIOR). THE DOOR COLOR SHALL MATCH THE COLOR AND FINISH OF THE EXISTING WINDOW MULLION OR THE EXISTING AUTOMATIC DOORS.
0%
Share of total value represented by subawards.
Start Date: Dec 19, 2018
End Date: Apr 19, 2019
100% of period elapsed
Awarding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Funding Agency
Funding Agency
Code: —
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|