Jennifer Perry
Oklahoma City, OK
USA
The Federal Aviation Administration (FAA) has a requirement for the Power Systems Design & Install. All work shall be accomplished in accordance with the attached SIR/request for Proposal (and attachments). It is anticipated that a stand-alone contract with firm fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238210. The business s...
View more| Name | Type | Posted | Action |
|---|---|---|---|
| J.36 Schedule B, Price Proposal PSDI II Cost Worksheet_10.28.2025.xlsx | XLSX | Mar 3, 2026 | |
| J.35 Phase 2 Technical Approach - Factor 2, Installation Proposal Form .docx | DOCX | Mar 3, 2026 | |
| J.34 Phase 2 Technical Approach - Factor 1, Design Proposal Form .docx | DOCX | Mar 3, 2026 | |
| J.33 PSDI II Technical Approach Evaluation Worksheets_02.27.2026.xlsx | XLSX | Mar 3, 2026 | |
| J.32 Phase I Relevant Corporate Experience Form.pdf | Mar 3, 2026 | ||
| J.31 Contractor Release DOT 4220.4 (1).pdf | Mar 3, 2026 | ||
| J.30 LPGBS Checklist.xls | XLS | Mar 3, 2026 | |
| J.29 6980_37 Maintenance of Solar Photovoltaic System.pdf | Mar 3, 2026 | ||
| J.28 FAA Order 6980_36 Maintenance of Hydrogen Fuel Cells.pdf | Mar 3, 2026 | ||
| J.27 FAA-STD-061A.pdf | Mar 3, 2026 | ||
| J.26 FAA-E-99001 - Photovoltaic Specification.pdf | Mar 3, 2026 | ||
| J.25 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf | Mar 3, 2026 | ||
| J.24 FST Program Specifications.pdf | Mar 3, 2026 | ||
| J.23 FST Guidelines.pdf | Mar 3, 2026 | ||
| J.22 FAA Order JO_6950_2F .pdf | Mar 3, 2026 | ||
| J.21 FAA Order JO 1050 17B.pdf | Mar 3, 2026 | ||
| J.20 FAA Order 6950_27B.pdf | Mar 3, 2026 | ||
| J.19 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf | Mar 3, 2026 | ||
| J.18 FAA Order JO_3900_57A_W-CHG_1_Inc.pdf | Mar 3, 2026 | ||
| J.17 FAA Order 1050.10D.pdf | Mar 3, 2026 | ||
| J.16 FAA-STD-032.pdf | Mar 3, 2026 | ||
| J.15 FAA-STD-019G.pdf | Mar 3, 2026 | ||
| J.14 faa-std-002H.pdf | Mar 3, 2026 | ||
| J.13 FAA-D-2494B.pdf | Mar 3, 2026 | ||
| J.12 FAA-C-1391f.pdf | Mar 3, 2026 | ||
| J.11 FAA-C-1217H Chg 2.pdf | Mar 3, 2026 | ||
| J.10 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc | DOC | Mar 3, 2026 | |
| J.09 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf | Mar 3, 2026 | ||
| J.08 Payment Bond - FAA Form Number 4400-61.pdf | Mar 3, 2026 | ||
| J.07 Performance Bond - FAA Form Number FAA 4400-63.pdf | Mar 3, 2026 | ||
| J.06 Travel Authorization Form.xlsx | XLSX | Mar 3, 2026 | |
| J.05 6010-5 CAI Form.pdf | Mar 3, 2026 | ||
| J.04 Government Furnished Equipment (GFE).pdf | Mar 3, 2026 | ||
| J.03 Data Item Description (DID).pdf | Mar 3, 2026 | ||
| J.02 Contract Data Requirements List (CDRL).pdf | Mar 3, 2026 | ||
| J.01 Statement of Work 02.17.26.docx | DOCX | Mar 3, 2026 | |
| J.00 Index.docx | DOCX | Mar 3, 2026 | |
| PSDI 2 - RFIs from DRAFT SIR.pdf | Mar 3, 2026 | ||
| 6973GH-26-R-00018 PSDI - 03.03.26.pdf | Mar 3, 2026 |
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
—
Power Systems Design & Install 2 Solicitation - 6973GH-26-R-00018
—
Phase I bids are due Friday, April 03, 2026 5:00pm CDT.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).