1. Description: This is a Sources Sought Notice and is issued solely for market research and planning purposes to identify potential sources capable of providing the construction needs for a Design-Build (DB) contract to execute a complete roof replacement for Section A of Building 1130 (highlighted in the Condition Assessment Report) at Shaw AFB. The contractor shall provide all design, engineering, labor, mat...
View more| Name | Type | Posted | Action |
|---|---|---|---|
| Attachment 04 - Thermal Board Insulation Specification.pdf | Mar 6, 2026 | ||
| CATEX list with examples.pdf | Mar 6, 2026 | ||
| DD Form 1354 - AUG 2022.pdf | Mar 6, 2026 | ||
| Contract Environmental Provisions.pdf | Mar 6, 2026 | ||
| SOW VLSB 26-0069.pdf | Mar 6, 2026 | ||
| Attachment 08 - Modified Bituminous Roof System Specification.pdf | Mar 6, 2026 | ||
| Attachment 09 - UFC_3-110-03.pdf | Mar 6, 2026 | ||
| Attachment 02 - Bldg 1130 I.R Scan Report.pdf | Mar 6, 2026 | ||
| Attachment 07 - FOR CONSTRUCTION - Drawings Volume 2 Shaw AFB B1130.pdf | Mar 6, 2026 | ||
| Attachment 01 - CAR B1130-HQ_AF.pdf | Mar 6, 2026 | ||
| Attachment 03 - Shaw AFB Design Constr.pdf | Mar 6, 2026 |
B1130 ROOF REPLACEMENT
—
B1130 ROOF REPLACEMENT
—
f) Demolish the existing penthouse roof access. Demolish all existing access past the floor below the roof as these appurtenances are no longer required. Provide all necessary renovations and additions to structurally frame and fill the opening left from the penthouse demolition. Provide all necessary renovations and additions to retain stairway functions, fire rating and overall operations after transformation (drop down ceiling, lights, fire protection system etc).
g) Remove and replace all metal coping on all the remaining parapet walls, including the elevator shaft.
h) Extend existing vents, roof curbs, ducts and other penetrations as required and flash properly.
i) Install a new Horizontal Lifeline System / Fall Protection System.
j) Ensure all work complies with the Unified Facilities Criteria (UFC), UFC 3-110-03 Roofing, the Shaw AFB Design and Construction Guide, and all attached specifications.
k) Accomplish the work while omitting/minimizing operational impact on the fully functional, 24/7 mission-critical B1130 facility.
2. Submission Requirements:
Interested vendors are invited to submit the following information:
Company Information
3. Submission Instructions:
Response Deadline: 13 March 2026, 4:00 PM EST
Submission Method: Email responses to [email protected]
Subject Line: Sources Sought Response - B1130 Roof Replacement.
Disclaimer: This Sources Sought is issued solely for information and planning purposes and does not constitute a solicitation. This notice shall not be construed as a commitment by the Government to issue a solicitation or award a contract. The Government will not reimburse any costs incurred.