Project Title: NFSR 205 Pavement Reconstruction LOUISIANA
Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5.
NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m).
PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways.
Magnitude: Between $2,000,000 and $3,000,000.
Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location.
Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition.
Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder.
Tentative Dates:
Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson [email protected]
Date for Questions: 04/20/2026.
Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required
Delivery: 120 Days After Notice to Proceed
Period of Performance: 120 Days After Notice to Proceed
All proposals will be emailed to [email protected] and cc [email protected] You may email to confirm receipt.