-------- ATTENTION // OPENING UP FOR ROUND #3 OF RFI in BOLD below // RESPONSE REQUESTED. --------- 3/9/2026 AGENCY/ORGANIZATION: Department of the Air Force, Air Force Materiel Command, AFNWC/NIMT WEAPON SYSTEM: Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) IPT: Ground Mechanical RFI PURPOSE: This RFI provides notice that the PTT2 program team is currently evaluating the availability an...
View more| Name | Type | Posted | Action |
|---|---|---|---|
| EVMS Background Paper 20260105.pdf | Jan 21, 2026 | ||
| PTT2 Industry Day Questions_6 Jan.pdf | Jan 21, 2026 | ||
| PTT2 Industry Day Report_20260105.pdf | Jan 21, 2026 | ||
| PTT2_Meeting Minutes.pdf | Jan 21, 2026 | ||
| AFNWC NIMT PTT2 Industry Day Slides 16 Dec 2025.pdf | Dec 17, 2025 | ||
| PTT2 Industry Day 1-on-1 Prompts.pdf | Nov 25, 2025 | ||
| VAL Request Form.pdf | Nov 25, 2025 | ||
| Poe Conference Center Map.pdf | Nov 25, 2025 | ||
| PTT2 Industry Day Flyer 20251216.pdf | Nov 25, 2025 | ||
| PTT2 Response Template 2_v2.0.docx | DOCX | Sep 19, 2025 | |
| PTT2 SOW - Initial - 10 Jun 2025.pdf | Sep 19, 2025 | ||
| Attachment 1. PTT2 System Requirements Document.pdf | Sep 19, 2025 | ||
| PTT2 Response Template 2_v2.0.docx | DOCX | Sep 19, 2025 | |
| PTT2 Response Template_v3.0.docx | DOCX | Jul 16, 2025 | |
| Attachment 1. General Requirements PTT2.docx | DOCX | Jul 16, 2025 | |
| PTT2 SOW - Initial - 10 Jun 2025.pdf | Jul 16, 2025 |
BACKGROUND:
The Air Force’s (AF) fleet of PTT must support the MMIII LGM-30G ICBM until the end of its operational life. However, the existing challenge of parts obsolescence poses a significant obstacle to providing seamless support. Additionally, a scarcity of spare parts, some entirely unobtainable, coupled with substantial engineering updates required by the Technical Data Package (TDP), further complicates the situation. Given these considerations, the AF aims to develop a new design, create a new TDP, and ultimately increase the PTT fleet. Procurement of five PTT2, including one to two PTT2 during the Engineering, Manufacturing, and Development (EMD) phase, will be required. During Production, the AF expects to procure the remaining three or four PTT2s for a total of five.
PTT DESCRIPTION:
The PTT is a trailer that provides protection and transportation of PSREs housed within a PSRE Shipping Container. The PTT is used to transport the PSRE(s) to various storage and operational locations. The PTT provides a transportation platform that limits excessive shock and vibration to the PSRE assembly. It also provides a temperature-controlled environment designed to keep the PSRE within its required temperature range during transportation. The Environmental Control Unit provides the required temperature control by use of an on-board diesel fueled generator and a closed loop Heating, Ventilation, and Air Conditioning unit.
///////////////////////// ROUND #3 RFI ///////////////////////
INFORMATION SOUGHT:
RESPONSES:
Responsible and capable sources may identify their interest by providing a white-paper capability statement (limited to 2 pages) with sufficient information to substantiate that respondents can successfully perform all requirements. Interested parties should make an earnest effort to thoroughly answer the Government’s questions. Please see the RFI question set. Government will consider responses to one or all purposes depending on company’s capability.
ELIGIBILITY REQUIREMENT:
Distribution of the PTT2’s Statement of Work and SRD are limited to contractors with a DD 2345 certified by the Defense Logistics Information Service, Joint Certification Program (1-877-352-2255) who have a legitimate business purpose. As such, these Attachments cannot be provided to a contractor without a certification. Contractors who would like to become certified can find the form and instructions at:
https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx.
This RFI is issued solely for informational and planning purposes. No funds are available to fund the information requested. The information in this notice is current as of the publication date but is subject to change and is not binding to the Government. Oral submissions of information are not acceptable. For access to the attachments, your response advising if the requirements stated above can be met, and all questions related to the above please email to the following addresses: [email protected] and [email protected]
Submit the following information:
ATTACHMENTS / LINKS:
edit: limit adjusted to 10 pages
Q&A:
Question 1: Is this a new requirement? Or is there an incumbent contract/contractor currently performing the services? Would you be able to share the contract details for reference?
Answer 1: The PTT2 acquisition will be a new design and manufacturing effort to procure supplies not services, therefore there is no incumbent contractor performing services related to this acquisition. While this is not a new requirement in terms of the Minuteman III Weapons System, as an existing (i.e., legacy) fleet of PTTs exists, procurement of this new fleet will include new technical data package development and PTT2 manufacturing; these will mirror the legacy PTTs in terms of form, fit, and function. The legacy fleet was procured in 2004 and there has been no involvement from the OEM since procurement. Sustaining maintenance/repairs over the past 21 years has been accomplished at the depot-level, as defined in Title 10 USC 2460, consequently there are no contracts available for reference.
Propulsion System Rocket Engine (PSRE) Transport Trailer 2 (PTT2)
—