Contracts G. Office
Hood River, OR
USA
Update 3/02/2026: Bid Tabulations posted to attachments.
Update 2/27/2026: Bid summary posted to attachments.
Update 2/20/2026: Amendment A002 and QA_2.20.2026 posted to attachments.
Update 2/12/2026: Amendment A001 posted to attachments.
Project: OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project
The Invitation for Bids (IFB), Plans, Physical Data, Link to Bid Opening, and the Construction Contract Administration Document per FAR 36.211 are posted under "Attachments/Links".
| Name | Type | Posted | Action |
|---|---|---|---|
| BidTabulation_OR WA FLAP CRGNSA Sign Project signed.pdf | Mar 2, 2026 | ||
| BidSum_OR WA FLAP CRGNSA Sign Project.pdf | Feb 27, 2026 | ||
| QA_2.20.2026.pdf | Feb 20, 2026 | ||
| Amendment A002.pdf | Feb 20, 2026 | ||
| Amendment A001.pdf | Feb 12, 2026 | ||
| ora-waa-crgnsa-mult2_plans_A001.pdf | Feb 12, 2026 | ||
| Link to Bid Opening | LINK | Jan 21, 2026 | |
| ora-waa-crgnsa-mult2_plans_IFB.pdf | Jan 21, 2026 | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | Jan 21, 2026 | ||
| WFLHD-28.pdf | Jan 21, 2026 | ||
| ODOT ROW Map 6B-15-13.pdf | Jan 21, 2026 | ||
| FLH Bridge oversized or overload vehicle permit request form August 2023.pdf | Jan 21, 2026 | ||
| IFB_69056725B000008_OR WA FLAP CRGNSA MULT(2).pdf | Jan 21, 2026 |
OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project
—
OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project
—
OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project
—
OR FLAP CRGNSA MULT(2) & WA FLAP CRGNSA MULT(2), CRGNSA Sign Inventory, Maintenance, and Replacement Project & CRGNSA Sign Project
—