Laura Slauter
WY 82831
USA
This requirement is to improve access to the Bighorn National Forest and Bureau of Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to U.S. Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues.
| Name | Type | Posted | Action |
|---|---|---|---|
| WY FLAP SHE 26(1) Red Grade Road Bid Opening Summary 2.24.26.pdf | Feb 24, 2026 | ||
| WY FLAP SHE 26(1) Red Grade Road Bid Opening Sign in 2.24.26.pdf | Feb 24, 2026 | ||
| A002 WY FLAP SHE 26(1) RED GRADE ROAD PHASE 1.pdf | Feb 20, 2026 | ||
| A001 WY FLAP SHE 26(1) Red Grade Road Phase 1.pdf | Feb 18, 2026 | ||
| PRE BID MEETING ATTENDEES 11 13 2025 WY FLAP SHE 26(1) RED GRADE ROAD PHASE 1.pdf | Feb 18, 2026 | ||
| QnA _2.18.26_.pdf | Feb 18, 2026 | ||
| INTERESTED VENDORS LIST WY FLAP SHE 26(1) RED GRADE ROAD PHASE 1.pdf | Feb 12, 2026 | ||
| Questons and Answers 6982AF25B000010 01 30 2026.pdf | Jan 30, 2026 | ||
| WY FLAP SHE26(1) Plans.pdf | Jan 21, 2026 | ||
| WY_26(1)_Red Grade Road_Hydraulics Memo_ADDENDUM.pdf | Jan 21, 2026 | ||
| IFB 6982AF25B000010 WY FLAP SHE 26(1) RED GRADE ROAD PHASE 1.pdf | Jan 21, 2026 | ||
| WY_26(1)_Red Grade Road_Hydraulics Memo.pdf | Jan 21, 2026 | ||
| WY Red Grade Road Final Pavement Memo Signed.pdf | Jan 21, 2026 | ||
| WY FLAP SHE 26(1) Red Grade Road.Addendum Memo FINAL.December 2025.pdf | Jan 21, 2026 | ||
| WY.FLAP.SHE.26(1).Red Grade Road.Geotech Rpt FINAL.Apr 2025_Rock Ex, Cut & Fill Rockeries, Buttress, SRE.pdf | Jan 21, 2026 | ||
| FP-14_Eng.pdf | Jan 21, 2026 | ||
| WY FLAP SHE26(1) Cross Sections.pdf | Jan 21, 2026 | ||
| Physical Data File.zip | ZIP | Jan 21, 2026 |
WY FLAP SHE 26(1), Red Grade Road, Phase 1
—
WY FLAP SHE 26(1), Red Grade Road, Phase 1
—
WY FLAP SHE 26(1), Red Grade Road, Phase 1
—
WY FLAP SHE 26(1), Red Grade Road, Phase 1
—