The A/E Design Firm shall provide all TITLE I Design Services required to
develop a comprehensive A/E design and a complete Issued For Construction (IFC) set of
documents. The contractor is to evaluate site conditions for the replacement of eighteen
(18) transformers located in B820 and B830. These transformers have medium voltage
primaries with various secondary voltages ranging from 208 volts to 4160 volts. The
resulting IFC construction documents shall be for the demolition of existing transformers
and the installation of new transformers, including a strategy for overcoming conflicts of
getting the materials in and out of the buildings. The complete IFC package shall include
drawings, specifications, a construction Statement of Work (SOW), a submittal register, an
estimate of probable construction cost, and a Design Analysis. The A/E shall also conduct
site investigations, review as-built drawings, hold design review meetings with Government
stakeholders, and ensure all designs conform with DoD Building Code (UFC-1-200-01) and
all associated Unified Facilities Criteria (UFC).